Investigations
The Dams Are Full. Is Anyone Adding Up Scenic Rim Water?
By KCV Media · Published
Maroon Dam Road, Scenic Rim, 9 October 2026. Photo by KCV Media
The dams are full today. That's exactly why this conversation can't wait.
This one's our backyard. The Scenic Rim has towns Seqwater plans for as off-grid communities, relying on local creeks and dams. It's also home to a State Development Area set aside for heavy industry, sitting on the catchment of a drinking water supply. Those facts sit side by side, and they deserve to be looked at together.
So here's the question KCV Media put to the public record. When the next serious drought arrives, will Scenic Rim water supplies hold up, and is anyone checking whether all the new demand adds up?
We went looking for the answer. What we found is a set of drought plans built town by town, industrial approvals assessed project by project, and no public document we could locate that puts the whole picture together.
We also found something new. The planning documents for Cleanaway's proposed incinerator at Bromelton went public on 1 October. They show it would draw about half a million litres of drinking water a day from Urban Utilities' Beaudesert network, with no drought plan we could find.
The warning is already on the board
The Bureau of Meteorology's update of 29 September says El Niño "nears record levels." The relative Niño3.4 index for the week ending 27 September was +2.72°C, well above the +0.80°C threshold. That's the second-highest weekly value in the Bureau's records, which start in 2008. The Bureau expects further warming through spring, with the event persisting into autumn 2027.
Let's be straight about what that means. El Niño raises the risk. It doesn't guarantee drought in the Scenic Rim. The Bureau itself says a strong El Niño "does not necessarily mean strong impacts on Australian rainfall and temperature." The 2023-24 event produced Australia's driest three-month period on record, then summer storms brought above-average rain to many areas.
And right now, the storages are healthy. On the morning of 13 October, Seqwater's figures put Maroon Dam, which backs Beaudesert's supply, at 98.2 per cent, Wyaralong at 95.6 per cent and Moogerah, which backs Boonah-Kalbar, at 76.0 per cent. The SEQ Water Grid overall sat at 79.4 per cent. Wyaralong's water won't reach Scenic Rim taps until its new treatment plant opens, though. That's planned for 2032.

That's the point. Full dams are when you plan. Empty dams are when you find out whether you did.
Three towns, three drought plans
Most of South East Queensland drinks from an interconnected grid. If one dam runs low, water can be moved from another. About 55,000 people across the region don't have that safety net. Seqwater calls them off-grid communities, and three of them are in the Scenic Rim. Beaudesert, Boonah-Kalbar and Canungra.
Each has its own drought response plan, all dated 21 March 2023. Read them and the vulnerability is laid out in black and white.
Beaudesert draws from the Logan River, supported by releases from Maroon Dam, under a high-priority entitlement of 3,165 megalitres a year. The drought triggers are pegged to Maroon Dam. At 12 per cent, medium restrictions kick in and supplementary carting becomes possible. At 10 per cent, high-level restrictions encourage residents to get down to 120 litres per person per day, and Seqwater commits to supplying up to 2.5 megalitres a day through a mix of trucked water and whatever's left in the local source.
Beaudesert's position is changing, though. Seqwater says its 24-kilometre South West Pipeline, with major construction completed in 2024, can move up to 2.5 million litres a day into the region when needed. Seqwater's own project page still says Beaudesert "will soon be connected." The March 2023 drought plan predates the pipeline, so it's fair to ask how Beaudesert's triggers and carting arrangements work now. We did. That question wasn't answered.
Boonah-Kalbar relies on Reynolds Creek with support from Moogerah Dam releases, under a 1,690 megalitre annual entitlement, through a treatment plant with a capacity of 2.87 megalitres a day. When Moogerah drops to 5 per cent, the plan calls for high-level restrictions, with Seqwater committing to up to 1.5 megalitres a day from trucked water and the local source combined.
Canungra is the most fragile on paper. Its supply is Canungra Creek, which it shares with local irrigators, under a licence of just 150 megalitres a year. The triggers are based on creek flow. When the creek hits zero, Seqwater commits to trucking in up to 420 kilolitres of drinking water a day.
And the creek is already dropping. On 23 September, Urban Utilities told Canungra residents flows had "fallen below 15 megalitres per day following a lack of rainfall over the catchment." Fifteen isn't a random number. Canungra's drought plan lists it as the "drought pre-trigger." The plan itself is activated when flows fall below seven.
This isn't new for Canungra either. Urban Utilities issued the same below-15 warning in October 2025. In 2023 the plan was activated in August, five months after it was written, and by October that year the creek was running under three megalitres a day. The town stayed in the plan's "drought readiness" phase and didn't go to restrictions.
Seqwater doesn't sugar-coat it. On its Canungra upgrade page it states: "Climate change means severe droughts and floods are more likely to be experienced." It also says no single option, "such as demand management, off-stream storage or stormwater harvesting, on their own is the answer to managing water security for Canungra." Seqwater expects the business case for the Canungra upgrade to be finished in late 2027. Construction could begin from 2029.
Water carting isn't a hypothetical in these plans. It's the written contingency.
Bromelton, the industrial heart
On Beaudesert's doorstep sits the Bromelton State Development Area. It's 15,610 hectares, declared in 2008 for "high-impact, difficult-to-locate and rail-dependent industries." Tenants listed by the Coordinator-General include SCT Logistics, GELITA Australia, Bromelton Quarry and the Beaudesert Central Waste Management Facility.
Seqwater states that "the majority of the Bromelton SDA is contained within the Water Resource Catchment and Water Supply Buffer Area for the Logan River drinking water supply." That catchment feeds the Beaudesert Water Treatment Plant and the planned Wyaralong plant.
Into that precinct comes Cleanaway's proposed Bromelton Energy and Resource Centre, known as BERC. ABC News has reported it as a $1.5 billion facility built to burn 760,000 tonnes of waste a year. Cleanaway lodged its application with the Coordinator-General in March 2026, and says a decision is expected in early 2027. Public consultation opened on 1 October and closes on 16 November 2026.
Where BERC's water would come from
When we first wrote these questions, Cleanaway's public page said nothing about where BERC's water would come from or how much it would use. The application documents now on the Coordinator-General's consultation site do.
Cleanaway's engineering report, prepared by Arup and dated 21 July 2026, estimates the plant's "overall nominal water demand" at 502.4 cubic metres a day. That's about half a million litres of drinking water every day, for boiler make-up water, flue gas treatment, ash processing and staff use, after allowing for rainwater captured on site.
Put that in local terms. These are KCV Media's own calculations from the published figures.
- It's about 183 megalitres a year, close to 6 per cent of Beaudesert's entire annual town entitlement.
- It's more than the 420 kilolitres a day Seqwater commits to truck into Canungra if the creek stops.
- It's about a fifth of the 2.5 megalitres a day Seqwater commits to Beaudesert under its worst drought stage.
The source is Urban Utilities' town network. The report says the plant would connect to an existing water main on Beaudesert Boonah Road, built in 2018 for future industry and since disconnected. In a July 2025 advice note included in the application, Urban Utilities says that once the main is recommissioned, "water is supplied through this main from the Birnum range water supply zone." Its 2023 advice names Seqwater's existing Helen Street treatment plant as "the primary source of water for the region." The main is planned to be operational by 2031. A dedicated Bromelton reservoir has a planned delivery date of 2035, and Urban Utilities says it's "not required to initiate development."
For construction, which Arup's correspondence says is due to run from 2028 to 2032, Urban Utilities lists a metered standpipe or the water filling station on Helen Street in Beaudesert. That's the same filling station water carters use.
The demand figure has also moved. Urban Utilities' 2023 advice note records Cleanaway asking for 180 to 200 cubic metres a day. By 2025 that had risen to an average of 550, with a peak of 32 cubic metres an hour. The 2026 report settles on 502.4. Urban Utilities says its modelling confirms the main has capacity for the higher figure, and that it supports the increase "as it is necessary to effectively commission the existing main."
What we couldn't find is a drought plan for BERC. We searched Cleanaway's engineering report, its technical process description and the first part of its stormwater report for any mention of drought, and found none. The documents set out where the water comes from in normal times. They don't say what happens to a half-megalitre-a-day customer on the Beaudesert network when Maroon Dam falls toward its trigger levels.
What the state agencies told the Coordinator-General
The application file also holds the advice state agencies and Council gave the Coordinator-General. Some of it goes further than anything they told us.
Seqwater's final advice, dated 28 September 2026, doesn't object to BERC, as long as its recommended conditions are "imposed in full and effectively administered and enforced for the life of the development." Those conditions cover water quality monitoring, waste controls, PFAS testing, trigger levels and stormwater.
But the same letter is blunt about the risk. Seqwater says it has not identified "a directly comparable Australian facility operating within a drinking water catchment." It says that "of all potential uses in the Bromelton SDA, the proposed facility could reasonably be considered to present the greatest risk of generating unknown, emerging and PFAS/PFOS contaminants." It also says the proposed operating temperature of about 850°C "would not reliably achieve complete PFAS destruction and mineralisation should PFAS-containing materials be present."
Then there's this, under the heading Regional Water Security. Seqwater refers to "frequent shut-downs of the Beaudesert Water Treatment Plant directly due to discharges from other industrial establishments in the Bromelton Area." It warns that "further challenges or shut-downs at the plant would place additional pressure on supplies in the interim," while the pipeline and the Wyaralong plant are delivered. The letter doesn't name the businesses or give dates. We don't know whether the treatment plant outage in Beaudesert on 26 September, which saw residents asked to cut their water use, had anything to do with it, and we won't guess.
The environment department reached a different view. In its advice of 4 September, it said the development "is not expected to adversely impact the values of the water supply catchment or the operation of key water supply infrastructure." It found Cleanaway's health risk assessment "satisfactorily demonstrated" that estimated PFAS levels "are not expected to pose a danger to human health and the risk of environmental harm is negligible."
Two state referral agencies, reading the same application, came to different conclusions on the risk to the drinking water catchment. Readers can weigh that for themselves.
Scenic Rim Regional Council's advice, dated 10 September, raised "the availability of essential services including water supply, sewerage infrastructure, and energy networks." In the same section it said "infrastructure planning and investment would be required prior to any consideration of further large-scale industrial development."
Seqwater's letter also notes the Coordinator-General "plans to undertake an SDA-wide air and water quality assessment in due course." That's a water quality study. It isn't the same thing as adding up how much water the precinct will need in a drought.
Floods, ash and runoff
There's a flood side to this too. The Bureau of Meteorology lists significant Logan-Albert floods in 1887, 1947, 1974, 2013, 2017, 2022 and 2025, and says 200 to 300 millimetres of rain across the catchment in 24 hours typically brings significant flooding. The Logan River at Beaudesert reached 14.76 metres in 2017 and 13.62 metres in 2022.
Cleanaway's public page promises no discharge of process wastewater "during normal operation." Its technical process description adds that if process wastewater ever has to leave the site, it "will be removed via tanker truck" to an accredited treatment facility.
Rain falling on the ash stockpiles is handled separately. Runoff from the ash aggregate hardstand drains to a lined retention basin. The stormwater report says the basin's concept design follows a Victorian EPA guideline for a "90th percentile wet year" or "a 1-in-20 year storm," with a minimum volume of 1,995 cubic metres. If it gets close to full, collected runoff gets tankered off site.
Seqwater wants more. Its recommended conditions say the basin catching contaminated runoff from the ash area should be designed for "at least a 1% AEP event," that's a one-in-100-year event, plus climate change allowances and a metre of freeboard, and kept at "a zero discharge scenario at all times." Whether that condition makes it into any approval is up to the Coordinator-General.
The landfill question
Scenic Rim Regional Council runs its Central (Bromelton) waste facility on Waste Facility Road, Bromelton.
In its Quarter Three 2025-2026 Service Delivery Report, Council listed an upcoming task: "Investigate short and long-term leachate management systems for Bromelton Landfill."
It isn't the first sign. On 27 May 2026, in closed session, Council voted unanimously on a late item titled "Bromelton Landfill Airspace and Leachate Requirements." The minutes record an evaporation unit, fuel to run it, tankering of "contaminated water" and large-scale leachate containment tanks. Three of those steps were approved because "a genuine emergency exists and immediate action is required." Councillors also asked for a further briefing on "the management of Cell 2C."
None of that proves contamination has left the site. But it tells you leachate at Bromelton has been an emergency inside Council this year, not a someday problem.
Queensland's landfill guideline sets the bar clearly. It says "a landfill must not impact on environmental values of groundwater." It says groundwater monitoring should "act as an early indicator of leachate contamination in groundwater prior to offsite migration" and give "an indication of the downstream groundwater quality that a permitted groundwater user may find."
So the questions are simple. What does the monitoring at Bromelton actually show? What happened with Cell 2C, and why did Council need emergency tanks and tankering in May? We put those questions to Council and to the environment department in writing. Neither answered within the five business days given.
A warning from Dalby
The same collision is playing out on the Western Downs. Dalby has long relied on groundwater, and a March 2025 council report found "Bore yields and water quality have reduced significantly." Into that stressed system comes a proposed data centre whose published water figures changed between the ABC's August 2026 reporting and the project's own website, which now says "updated figures may differ from those included in the lodged development application." None of Dalby's figures apply to the Scenic Rim. The pattern does. Big new demand arrives project by project, and the numbers move along the way. BERC's own water figure has already moved from 180 to 200, then 550, then 502.4 cubic metres a day.
What we asked, and what came back
On 25 September 2026, KCV Media put written questions to Seqwater, Urban Utilities, Scenic Rim Regional Council, Cleanaway, the Office of the Coordinator-General and the Department of the Environment, Tourism, Science and Innovation. Each was given five business days to respond.
The Office of the Coordinator-General replied within the five business days. A spokesperson said the office is assessing BERC under the Bromelton SDA Development Scheme and that "a range of environmental, infrastructure and water-related matters are being considered with advice from relevant referral entities." The office will consider the application, referral advice and public submissions before deciding. It didn't answer our questions about flood design standards, forecast industrial water demand across the SDA, or cumulative drought modelling.
Seqwater's response came in the same email from the Department of State Development, Infrastructure and Planning. A Seqwater spokesperson said Urban Utilities "submits a demand forecast to Seqwater every 12 months," which feeds Seqwater's Water Security Program, a 30-year outlook "reviewed at least every 5 years." It didn't answer our questions about secure yield, how often drought triggers have been reached, Beaudesert's arrangements since the pipeline, or the Bromelton Off-stream Storage. It didn't refer to the referral advice Seqwater sent the Coordinator-General on 28 September.
Urban Utilities did not respond to our questions within the five business days given.
Scenic Rim Regional Council did not respond to our questions within the five business days given.
The Department of the Environment, Tourism, Science and Innovation did not respond to our questions within the five business days given.
Cleanaway did not respond to our questions within the five business days given.
The empty storage is still unexplained. Seqwater's Bromelton Off-stream Storage, completed in 2008 about five kilometres north of Beaudesert beside the Logan River, holds 8,210 megalitres when full. That's more than two and a half times Beaudesert's annual town entitlement. Seqwater's own page says it "is currently not in use" and lists its volume as 0 ML. We asked why. Seqwater didn't say.
What we still don't know about Scenic Rim water
This is where the evidence stops, and so do we.
KCV Media has not found a public, cumulative water-balance assessment for the Scenic Rim that combines residents, agriculture, existing Bromelton industry, BERC, future growth and a severe-drought scenario. We asked all six agencies whether one exists and which agency is responsible for it. Seqwater pointed to its 30-year Water Security Program, but didn't say whether a cumulative drought assessment for the Scenic Rim exists. The other five didn't answer the question. That doesn't prove there isn't one. It means if there is, the community hasn't been shown it.
Public consultation on BERC closes on 16 November 2026. The application, the agency advice quoted here and details on how to make a submission are on the Coordinator-General's consultation site at haveyoursay.coordinatorgeneral.qld.gov.au. Submissions can also go to sdainfo@coordinatorgeneral.qld.gov.au or by post to PO Box 15517, City East Qld 4002.
The bottom line
Nobody is saying the taps are about to run dry. The dams are near full and the drought plans exist. That's the fair picture.
But those plans still assume trucks rolling into Canungra when the creek stops. They were written in March 2023, before this El Niño, before Beaudesert's pipeline was finished, and before BERC was lodged. Now the application shows a new industrial customer drawing half a million litres a day from Beaudesert's network, with no drought plan we could find. Each project gets its own assessment. Each town gets its own drought plan. What we couldn't find is anyone publicly adding it all up.
When the rain stops, that's the sum that matters.
Editor's Note
KCV Media's founder lives in the Scenic Rim and has publicly opposed the Bromelton Energy and Resource Centre proposal, including reading his own poem against it at a community rally on 10 October 2026. We're not hiding that.
The facts in this piece are sourced and attributed the same way as everything this masthead publishes, and every agency named in it was given the chance to respond. Where he stands is his own view, stated here so readers can weigh it for themselves.
Related: The Squeeze Part 4: Water, Waste and Wildlife
MAKE IT YOURS | NEVER SURRENDER
Sources
BERC application and agency advice (Office of the Coordinator-General consultation site, https://haveyoursay.coordinatorgeneral.qld.gov.au/sda/bromeltonsda/)
- Arup for Cleanaway, Engineering (Infrastructure) Report, Rev D, 21 July 2026, incl. Appendix D Urban Utilities Services Advice Notices 23-SAN-64867 (21 Apr 2023) and 25-SAN-80778 (9 Jul 2025)
- Arup for Cleanaway, Technical Process Description, Rev D, 27 July 2026
- Arup for Cleanaway, Stormwater Management Plan and Flood Risk Assessment, Rev D, 28 July 2026, Part 1
- Seqwater, Referral Entity Advice, Final Amended Advice, 28 September 2026
- Department of the Environment, Tourism, Science and Innovation, referral response, 4 September 2026
- Scenic Rim Regional Council, referral response, 10 September 2026
Climate and water supply
- Bureau of Meteorology, Southern Hemisphere Monitoring, 29 September 2026, https://www.bom.gov.au/climate/enso/
- Bureau of Meteorology, El Niño: what it means for Australia's climate, https://www.bom.gov.au/news-and-media/el-nino-what-it-means-for-australias-climate
- Bureau of Meteorology, Logan/Albert River Flood Warning System, https://www.bom.gov.au/qld/flood/brochures/logan_albert/logan_albert.shtml
- Seqwater, Dam levels and individual dam pages, read 6 October 2026, https://www.seqwater.com.au/dam-levels
- Seqwater, Water Security Program and off-grid communities, https://www.seqwater.com.au/waterforlife
- Seqwater, Beaudesert Drought Response Plan (PLN-00464), https://www.seqwater.com.au/document/2275
- Seqwater, Boonah-Kalbar Drought Response Plan (PLN-00463), https://www.seqwater.com.au/document/2276
- Seqwater, Canungra Drought Response Plan (PLN-00462), https://www.seqwater.com.au/document/2256
- Seqwater, Canungra Water Supply Upgrade, https://www.seqwater.com.au/project/canungra-water-supply-upgrade
- Seqwater, Beaudesert Water Supply Upgrade, read 6 October 2026, https://www.seqwater.com.au/project/beaudesert-water-supply-upgrade
- Seqwater, South West Pipeline fact sheet, Jan 2025, https://www.seqwater.com.au/document/2554
- Seqwater, Proposed Wyaralong Water Treatment Plant, https://www.seqwater.com.au/project/proposed-wyaralong-water-treatment-plant
- Seqwater, Bromelton Off-stream Storage, https://www.seqwater.com.au/dams/bromelton
- Seqwater, Planning and development, https://www.seqwater.com.au/planning-and-development
- Urban Utilities, 23 Sep 2026, Flows in Canungra Creek reduce as Spring sets in, https://www.urbanutilities.com.au/newsroom/articles/flows-in-canungra-creek-reduce-as-spring-sets-in-MCVB7VX655ZNAXRPZYH5HGHRD3E4
- Urban Utilities, 9 Oct 2025, Residents advised of falling flows in Canungra Creek, https://www.urbanutilities.com.au/newsroom
- Urban Utilities, 18 Oct 2023, Residents advised to prepare now as Canungra Creek flows fall, https://www.urbanutilities.com.au/newsroom/articles/residents-advised-to-prepare-now-as-canungra-creek-flows-fall-MCVTOL7JRX3JCGPFFC7VXSZH6K7E
- Urban Utilities, 27 Sep 2026, Beaudesert residents asked to reduce water use, https://www.urbanutilities.com.au/newsroom
Bromelton, BERC and landfill
- Office of the Coordinator-General, Bromelton State Development Area, https://www.coordinatorgeneral.qld.gov.au/work-with-us/state-development-areas/current-state-development-areas/bromelton
- Cleanaway, Bromelton Energy & Resource Centre, https://www.cleanaway.com.au/bromelton-energy-and-resource-centre
- ABC News, 28 Apr 2026, Scenic Rim community divided over proposed Cleanaway incinerator, https://www.abc.net.au/news/2026-04-28/cleanaway-proposes-waste-to-energy-incinerator-beaudesert/106585120
- Scenic Rim Regional Council, Service Delivery Report Quarter Three 2025-2026, https://www.scenicrim.qld.gov.au/files/assets/public/v/1/our-council/administration/corporate-publications/documents/quarter-three-service-delivery-report.pdf
- Scenic Rim Regional Council, Ordinary Meeting Minutes 27 May 2026, item 12.2, https://scenicrim.infocouncil.biz/Open/2026/05/CO_20260527_MIN_3736.PDF
- Queensland Government, Landfill siting, design, operation and rehabilitation guideline (ESR/2015/1627), https://www.detsi.qld.gov.au/_global/policy-register/policy-register-pdf?getdoc=1627&name=pr-gl-landfill-siting.pdf
Dalby comparator
- Western Downs Regional Council, Water in the Western Downs: Base Case Report, March 2025, https://www.wdrc.qld.gov.au/files/assets/public/v/1/council/advocacy/water/water-in-the-western-downs-a-base-case-report.pdf
- Western Downs Digital Park, project website, https://www.westerndownsdigitalpark.com.au/
- ABC News, 24 Aug 2026, International developer plans Australia's largest data centre in regional Queensland, https://www.abc.net.au/news/2026-08-24/plans-for-australia-largest-data-centre-in-regional-queensland/107071624
Agency responses to KCV Media (questions sent 25 Sep 2026, five business days given)
- Office of the Coordinator-General and Seqwater, via DSDIP Media, email 2 Oct 2026